2. Have the LED lighting fixtures passed CE certification?
Accessories, machine installation, and machine testing are the 3 major links, 100% in accordance with the European CE safety standard production machine.
3. How does the ODM process work?
100% free rendering scene design
100% free lamp appearance design plan
Sample product structure drawing is 100% free
Own laser + 3D printer out of the finished product sample
Own scoring ball, IES test process, 100% provide sample related reports
30-45 days shipping
Defective products less than 1/10000, own two AI quality control production lines; Tolerance within 5mm
4. How is it ensured that customized products are made according to requirements?
7 links of inspection, 100% in line with customer custom requirements, defective products less than 1/10000, own two AI quality control production lines; Tolerance within 5mm.
5. Is sample service supported?
Yes, samples are available within 5-15 days.
6. How long is the delivery time for samples and bulk orders?
The approximate shipping time for samples is 5-15 days, and 30-45 days for mass order.